What makes a CRM fit construction contractors specifically?
Six specific shape differences separate a construction-ready CRM from a generic SaaS CRM. Longer cycles (6 to 36 months from bid to project completion rather than 30 to 90 days). The bid phase as a distinct pipeline stage with its own math (bid-hit rate, bid volume, estimator capacity) rather than just another stage. Change orders that drift the deal value after award. The GC-sub two-sided relationship structure. The project handoff workflow continuing past closed-won into project operations. Retention and warranty periods that extend the relationship past project completion. A CRM configured without these shapes will not fit the construction motion; a CRM that ships them as native capabilities (configurable stages, custom change-order and retention objects, GC-sub relationships, project handoff Flows) will.