Does Strkr Projects replace monday.com for teams that run heavily on Slack?
Yes. Strkr Projects runs the board, the workflow engine, time tracking, and the Slack integration on one shared record store. The project, the task, the assignee, the dependency, the attachment, and the Slack notification live under one permission model and one audit log. The monday.com plus Slack plus middleware stack collapses into one surface. Views include Kanban, list, Gantt, and calendar with the same underlying record so a card move in Kanban reflects in Gantt instantly. The Slack connector is a first-class integration configured once through OAuth at the tenant level, with notification, approval, DM, thread, and reaction-trigger action nodes that all write back to the task with the audit record attached.
What project workflows run across Slack?
The nine project workflows most teams migrate first are task assigned (DM the assignee with task summary, due date, priority, deep link, with accept or reassign click handling), release approval (DM the engineering lead with release summary, changelog, risk assessment; approve or reject writes back), due date approaching (post to the project channel with hours remaining), blocker surfaced (DM the PM with the dependency chain for escalate or resolve action), sprint close (retro summary with velocity chart to team channel), scope change (DM the stakeholder with scope ask and schedule impact for approval), overdue task (DM the PM for ping-assignee or reassign action), status change (post to exec channel when project moves on-track to at-risk or off-track with drivers and mitigation), and comment mention (DM the user with comment text and deep link so reply writes back to the comment thread).
How does the migration from monday.com work?
The migration follows a repeatable path. First, monday.com exports via native API with boards, items, columns, groups, and item history. Second, columns map to Strkr field types (status, people, date, number, text, dropdown, formula) with the admin reviewing automatic matches. Third, groups map to Strkr Kanban columns, project phases, or sprints depending on the group purpose. Fourth, monday.com users map to Strkr users by email with mismatch resolution prompts. Fifth, admin reconnects Slack through OAuth once and the existing channel map carries into the workflow configuration. Sixth, the existing monday.com Automations rebuild on the Strkr engine with Strkr AI drafting the first version from a plain-English description. For risk-averse teams, Strkr supports parallel-run mode where monday.com and Strkr operate side by side for a week with the old integration layer still firing until parity is proven.
What project views does Strkr Projects support?
Strkr Projects renders the project in Kanban board view (drag cards across columns with status transitions logged), list view (dense sortable grid with per-column filtering and bulk edit), Gantt timeline (dependency arrows, baseline comparison, drag to reschedule, critical path highlighted), and calendar view (tasks on a calendar grid by due date or scheduled start). The views share the same underlying record so a card move in Kanban reflects in Gantt instantly. Views are first-class rather than add-on modes, and the admin can configure the default view per project or per role. Capacity view (per-user committed hours against available hours by sprint), dependency view (cross-project blockers), and portfolio dashboard (project status roll-up across the leadership view) all ship native.
Does Strkr Projects support time tracking natively?
Yes. Time tracking lives on the task with per-user entries, estimated versus actual, start-stop timer, manual entry, and automatic rollups to the project level. The time data feeds the capacity planning view so overload surfaces before the sprint commits. For agency workflows, the time tracking rollup aggregates by task, project, assignee, and client, with billing export generating invoices directly from the rollup rather than requiring a manual reconciliation. Time entries log on the audit trail with the user, timestamp, duration, and optional note so the compliance team sees the full posture. The time tracking is first-class rather than an add-on.
What reporting ships across projects and Slack-connected work?
The reporting surface includes project status roll-up (every active project with on-track, at-risk, or off-track status plus drivers and mitigation plan), velocity report (planned versus delivered points per sprint and per team with historical trend), capacity view (per-user committed hours against available hours), approval drift (approvals outside the configured policy band), SLA attainment per workflow and per owner, time tracking rollup by task and project and client, dependency view mapping task dependencies across projects, Slack engagement (click-through rate from Slack notification to Strkr task so low-value notifications can be pruned), and scheduled snapshots delivered weekly or monthly to the engineering leader or portfolio manager with week-over-week delta. HIPAA posture available with BAA, SOC 2 Type II in progress.