Built for Industrial Equipment Account Executives

The CRM industrial equipment AEs quote capital orders in.

AEs at packaging, process, material handling, machine tools, robotics, water treatment, HVAC, and power generation OEMs run 90 to 540 day capital equipment cycles with engineering review, options and accessories, install, commissioning, and multi-year service agreements on every deal. The CRM has to hold the configured equipment, the service plan, the install milestones, and the ERP handoff on one record.

Why buyers are here

Industrial Equipment Account Executives: the daily pains.

An industrial equipment AE job is different from a general manufacturing AE job. Capital equipment deals carry a configured machine (base model plus 15 to 60 options and accessories), engineering sign-off on the configuration, a long cycle from first demo through capex approval, DocuSign on both the purchase order and the service agreement, install and commissioning on the shop floor at the customer plant, and a 1 to 5 year service agreement that pays through long after the capex closed. The typical stack lives across Salesforce Manufacturing Cloud or a legacy ERP CRM module, a CPQ bolt-on for the configurator, Excel for the service agreement forecast, a shared drive for drawings and submittals, DocuSign for the PO, and a project management tool for install coordination. Nothing talks to anything else. The sections below show how Strkr collapses the capital equipment motion into one workspace with native configuration, service agreement forecasting on the Products module, DocuSign on the PO and the service agreement, install coordination on Strkr Projects, and ERP sync at Order Booked.

Configurator complexity

A configured packaging line has 60 options and no CRM holds them.

An industrial packaging line configures with base model, infeed options, control package, HMI language, voltage, discharge direction, safety fencing, vision system, and 40 other options and accessories. Standard CRM Opportunity line items were built for software seats, not for a configured machine where option 23 constrains option 47. The AE builds the quote in an Excel configurator the engineering team maintains, retypes the configuration into Salesforce, and the two drift apart. Strkr Products module handles configured line-item quoting with option dependencies, pricing matrices, and engineering sign-off on the deal record itself.

Service agreement forecast gap

A 5-year service agreement pays $120 thousand and nobody forecasts it.

A capital equipment deal often ships with a 1 to 5 year preventive maintenance and service agreement that pays 15 to 25 percent of the equipment value over the term. On a $400 thousand machine, that is 60 to 100 thousand dollars of annuity revenue the AE should carry on the forecast. The typical CRM has nowhere to represent recurring service revenue cleanly. Strkr Products module handles service agreement components with term, payment schedule, renewal cadence, and attached preventive maintenance intervals so the AE forecasts total contract value, not just the capex.

Install handoff gap

The PO signs, install starts in 10 weeks, and the AE is invisible.

An industrial equipment AE wins the capex order, the ERP absorbs the data, the equipment production starts, the shipment goes out 10 to 16 weeks later, and the install coordinator takes over at the customer site. The AE has no visibility into install milestones, commissioning status, or acceptance sign-off, and the customer calls the AE with status questions the AE cannot answer. Strkr Projects spins up on PO signature with install milestones, commissioning checklists, acceptance sign-off, and service agreement activation surfaced on the account.

Demo and FAT scheduling

Factory acceptance tests scatter across 3 calendars and 2 time zones.

An industrial equipment pursuit includes a factory acceptance test (FAT) where the customer engineering team visits the OEM factory to witness the configured machine running on representative material. The FAT scheduling involves the AE, the OEM engineering team, the customer engineering team, the OEM project manager, and often an outside integrator across 2 or 3 time zones. In the typical stack, FAT scheduling runs on an email thread. Strkr renders FAT scheduling on the deal record with milestone, participants, pre-FAT checklist, and FAT report so the acceptance moment is a documented artifact instead of email archaeology.

Capex approval cycle

A capex approval runs 90 to 180 days and the deal rots in Proposal.

An industrial equipment deal above $100 thousand triggers a customer capital expenditure approval cycle that runs 90 to 180 days through engineering review, operations review, finance review, and board approval depending on size. The deal sits in Proposal while the customer approval runs, and the AE forecast carries the deal with no visibility into capex cycle status. Strkr captures the capex approval milestones on the deal record with expected approval date, current approval stage, decision maker contact, and the specific approval objection themes from history.

Trade-in and used equipment

The deal includes a trade-in and nobody tracks the used equipment pipeline.

A capital equipment sale often includes a trade-in on the customer prior-generation machine, a buyback obligation, or a used equipment sale from the OEM used inventory. In the typical stack, trade-in and used equipment live in a parallel Excel the service manager maintains. Strkr custom objects track trade-in valuation, used equipment inventory, and buyback obligations on the deal record so the AE sees the full transaction economics and the operations team manages the used equipment pipeline on real data.

How Strkr fits the industrial equipment AE motion

The primitives capital equipment AEs actually use.

Strkr for Industrial Equipment Account Executives is the same CRM every other role at the OEM runs, with role-aware views and automations shaped around the capital equipment motion. The primitives line up with what the AE repeats on every deal: logging the equipment inquiry, running the discovery call on the application fit, scheduling the factory demo, building the configured quote on the Products module, scheduling the factory acceptance test, routing the capex approval, closing the PO through DocuSign, attaching the service agreement, and handing off clean to install and commissioning on Strkr Projects.

Capital equipment pipeline

A pipeline built for the 90 to 540 day cycle.

Column-per-stage board grouped by product line, application vertical, territory, or expected ship month. Drag a deal between stages and the flow enforces entry criteria (application fit confirmed, FAT scheduled, capex approval milestones captured, service agreement attached) and surfaces the missing artifact inline. The AE builds the view that matches the territory without a RevOps ticket.

Configured equipment on Products

Option-dependency logic on the quote line.

The native Products module handles configured machines with base model, options, accessories, and consumables as line items with option-dependency rules (option 23 requires option 11, voltage 480V constrains discharge direction, control package B excludes HMI language Mandarin). Pricing matrices live on the admin surface. The quote PDF renders a clean customer-facing document and the margin sheet renders for internal review with gross margin on every option.

Service agreement on the deal

Preventive maintenance and service as a native product.

Service agreements live on the deal as Products module components with term (1, 3, 5 years), payment schedule (annual, quarterly, monthly), covered services (preventive maintenance intervals, remote monitoring, phone support hours, on-site response SLA, parts coverage), and renewal cadence. The AE forecasts the service annuity alongside the capex and the service manager pulls the renewal queue off the record instead of a parallel Excel.

FAT scheduling

Factory acceptance test as a milestone on the record.

Strkr captures the FAT milestone on the deal with scheduled date, OEM participants, customer participants, pre-FAT checklist (configured machine built, representative material staged, test protocol approved, outside integrator notified), and post-FAT acceptance sign-off. The AE, the OEM project manager, and the customer engineering team work from one timeline instead of 3 email threads.

Capex milestones

Customer approval cycle visible on the deal.

The deal record captures the customer capex approval milestones with expected approval date, current approval stage, decision maker contact, and the specific approval objection themes from history. The AE and the sales manager see which deals are stuck in capex approval and run the right outreach to the right customer stakeholder at the right time instead of guessing at pipeline movement.

Install project on close

Strkr Projects spins up on PO signature.

At Order Booked, a Strkr Projects workspace spins up for the equipment delivery and install with milestones for engineering release, equipment production, shipment, site arrival, mechanical install, electrical install, commissioning, factory site acceptance test (SAT), customer sign-off, and service agreement activation. The AE sees the install status on the account record without opening the OEM project management tool.

Trade-in and used

Trade-in valuation and used inventory on the deal.

Custom objects track trade-in valuation (equipment make, model, year, condition, as-is value, after-recondition value), buyback obligations, and used equipment inventory with pedigree. The AE sees the full transaction economics on the deal record. The operations team manages the used equipment pipeline on real data instead of a Q4 reconciliation.

From signed PO to running equipment

Install, commissioning, service, and parts on one workspace.

The handoff from a signed PO to running equipment on the customer floor is where most capital equipment CRMs quietly stop. The AE wins the deal, the ERP absorbs the data, and the install coordinator takes over with no shared record. Strkr threads DocuSign for the PO and service agreement, fires a flow on signature return that pushes the order into the ERP, spins up a Projects workspace that surfaces install milestones on the account, activates the service agreement, and keeps the AE in the loop through to customer sign-off.

DocuSign and Adobe Sign

PO, service agreement, and MSA from the deal.

Both DocuSign and Adobe Sign are native integrations. Draft the PO from the configured quote on the deal, draft the service agreement from the Products service components, draft the MSA from the firm template, route internally for pricing approval, send to the customer procurement contact, and the signed PDF returns to the deal. The AE never juggles three signature portals.

Signature flow

Signed PO fires ERP handoff and install project.

When DocuSign returns the signed PO, the flow stores the artifact, flips the stage to Order Booked, pushes the configured equipment order into the ERP (NetSuite, Epicor Kinetic, Infor CloudSuite Industrial, Dynamics 365 Business Central, SAP S/4HANA Public Cloud), spins up the Strkr Projects install workspace, pings the production planner, pings the install coordinator, and pings finance for invoice setup. The AE moves on to the next deal.

Install milestones

Mechanical, electrical, commissioning, acceptance.

The install Projects workspace carries mechanical install milestones (base plate anchored, equipment positioned, utilities connected), electrical install (power connected, control system commissioned, HMI programmed), commissioning (dry run, wet run, production test), and customer acceptance sign-off. The AE answers the customer status call in 30 seconds instead of a browser tab juggle.

Service agreement activation

Service agreement goes live on customer acceptance.

When customer acceptance sign-off lands on the install project, the flow activates the service agreement on the account, schedules the first preventive maintenance visit, sets up the parts inventory consignment if the agreement includes it, and creates the service case tracker for the term. The service annuity revenue starts flowing on day one of the agreement, not after a 30 day administrative gap.

Service case tracking

Service tickets live on the account.

Service cases live on the account with ticket number, dispatched technician, time on site, parts consumed, labor hours, and resolution notes. The AE prospects the next capital order with warranty status, service history, and open service tickets visible on the account record so expansion lands on real context.

Parts and consumables

Parts orders live on the account.

Replacement parts, consumables, and spare parts kits order through the account record with ERP sync. The AE sees the parts order history across the installed fleet and the service manager runs the parts forecast off real data. The parts annuity revenue compounds alongside the service agreement revenue on the same account.

Flows for the capital equipment AE motion

Automations across inquiry, demo, FAT, capex, PO, and service.

The best industrial equipment AEs automate the administrative drag between stages and spend their hours on the three deals where application fit judgment matters most. Strkr Flows cover the automations every industrial equipment sales team should run as native triggers with no webhook plumbing. The pattern below shows up in week two of every deployment and compounds into cleaner handoffs, faster install, better service agreement attach, and tighter capex visibility.

Equipment inquiry

Inbound inquiry creates the deal with application context.

An inbound inquiry email with an application question lands in the sales inbox. A flow parses the sender, extracts the application context (industry, throughput, material, line speed), creates the deal, matches to a prior comparable installation, assigns the territory AE, and schedules a 24 hour acknowledgment task. The AE walks into the discovery call with the comparable installation pre-loaded.

Demo scheduling

Factory demo request fires a scheduling workflow.

When the AE schedules a factory demo on the deal, the flow confirms the OEM demo lab availability, pings the OEM application engineering team, schedules the pre-demo call to collect customer application material, and sends the pre-demo material shipping address to the customer. The demo lab is prepped on arrival instead of a scramble.

Configuration review

Configured quote routes to engineering.

When the AE marks the configured quote as ready, the flow routes the configuration to the OEM application engineering team for sign-off on option compatibility, material fit, line speed, and utility requirements. Engineering sign-off lands on the deal record as an audit event. The AE never sends a configured quote the engineering team quietly flags as impossible.

FAT scheduling

FAT request schedules the OEM test cell.

When the AE requests a factory acceptance test on the deal, the flow confirms the OEM test cell availability on the configured machine production schedule, pings the OEM project manager and the customer engineering lead, schedules the pre-FAT test protocol review, and reminds the AE to confirm the customer travel bookings 2 weeks ahead.

Capex approval tracking

Capex milestone changes update the forecast.

When the AE updates the capex approval milestone (engineering review complete, operations review complete, finance review complete, board approval scheduled), the flow updates the deal expected close date, flags any capex approval that is past its expected milestone date, and alerts the sales manager on the risk-adjusted forecast.

Service agreement attach

Deal save enforces service agreement attach.

A flow checks every deal on save for a service agreement component on the Products module. If the deal is past Qualification stage with no service agreement attached and the equipment type historically carries a service agreement, the AE sees an inline prompt before the deal moves to Proposal. The service agreement attach rate climbs from 40 percent to 75 percent in the first 2 quarters.

PO signature flow

Signed PO fires the full handoff.

DocuSign returns the signed PO, the flow stores the artifact, flips the stage to Order Booked, pushes the configured order into the ERP, spins up the Strkr Projects install workspace, maps BOM components to shop routing operations, assigns the production planner and install coordinator, and surfaces the install project on the account. The AE moves on to the next deal.

Customer acceptance

Acceptance sign-off activates service and prompts expansion.

When customer acceptance sign-off lands on the install project, the flow activates the service agreement, schedules the first preventive maintenance visit, prompts the AE for the 90 day post-install customer satisfaction call, and schedules the quarterly account review for the next capital opportunity on the installed base.

Head-to-head

Strkr vs the Salesforce Manufacturing Cloud + CPQ + Excel stack.

A typical industrial equipment OEM stack runs Salesforce Manufacturing Cloud for CRM, a CPQ bolt-on for the configurator, Excel for the service agreement forecast, a shared drive for drawings and submittals, DocuSign for the PO, and a project management tool for install coordination. The combined spend lands between 200 and 500 thousand dollars a year before admin headcount. Strkr collapses that into one workspace with the ERP preserved as the production system of record.

What matters Strkr Salesforce Manufacturing Cloud + CPQ + Excel + ERP
Tools an equipment AE opens daily 1 (Strkr) plus ERP for production 5 to 8 (CRM, CPQ, shared drive, service sheet, DocuSign, ERP, project tool)
Configured equipment on the quote Native Products module with option dependency logic CPQ bolt-on, extra per-seat charge, admin configuration project
Service agreement on the deal Native service components with term, payment, and renewal cadence Parallel Excel service forecast, no CRM visibility
Factory acceptance test tracking Native milestone on the deal with checklist and sign-off Email thread, no deal-level artifact
Capex approval milestones Customer capex cycle captured on the deal with risk-adjusted forecast AE memory, no pipeline visibility into capex status
PO contracts and signature DocuSign and Adobe Sign native, Flows on signature return Signature tool with manual CRM sync, no stage-bump automation
Install project after Order Booked Strkr Projects workspace with milestones on the account Separate project tool, no sales-side visibility
Service agreement activation Native flow activates on customer acceptance sign-off Manual Excel sheet handoff to service manager, 30 day gap typical
Trade-in and used equipment Native custom objects with valuation on the deal Parallel Excel the service manager maintains
Parts and consumables Parts orders on the account with ERP sync Parts order in ERP only, no CRM account visibility

See the CRM industrial equipment AEs quote capital orders in.

Start a 14 day trial with the full industrial equipment AE stack enabled: capital equipment pipeline, native Products module with configuration and option-dependency logic, service agreement components on the deal, FAT and capex milestone capture, DocuSign and Adobe Sign for the PO and the service agreement, ERP connectors for NetSuite, Epicor, Infor, Dynamics, and SAP, Strkr Projects for install coordination, and Flows for every stage from inquiry to service agreement activation. The pricing page lays out the per-seat line in full, and the custom-objects feature page shows how the trade-in, used equipment, and service agreement objects wire into the deal.

Common questions

Industrial Equipment Account Executives buyer FAQ.

Can Strkr handle a configured machine with 60 options and option-dependency logic?

Yes. The Strkr Products module supports configured line-item quoting with option-dependency rules on the admin surface. Industrial equipment OEMs regularly build quotes with 40 to 100 configured line items across base model, options, accessories, consumables, and services. Option-dependency rules (option 23 requires option 11, voltage 480V constrains discharge direction, control package B excludes HMI language Mandarin) run on the admin surface, so the AE never ships a quote the engineering team flags as impossible. The quote PDF renders clean for the customer, and the margin sheet renders for internal review with gross margin on every option.

How does the service agreement forecast work?

Service agreements live on the deal as Products module components with term (1, 3, 5 year), payment schedule (annual, quarterly, monthly), covered services, and renewal cadence. The forecast report pulls capex revenue, service agreement annual contract value, and parts annuity on the same deal record. The AE forecasts total contract value, not just the capex. The service manager pulls the renewal queue off the Products renewal cadence field instead of a Q4 Excel reconciliation. For OEMs running a separate service agreement management system, Strkr Flow integrates both directions so the Products module is the forecast surface and the service system is the delivery system.

How does install coordination work after the PO signs?

At Order Booked, a Strkr Projects workspace spins up for the equipment delivery and install with milestones for engineering release, equipment production, shipment, site arrival, mechanical install, electrical install, commissioning, site acceptance test, customer sign-off, and service agreement activation. The AE sees the install status on the account record without opening the OEM project management tool. The install coordinator updates milestones against the project and the AE answers the customer status call in 30 seconds. For OEMs with install teams running on Microsoft Project or Smartsheet, Strkr Flow syncs milestones both directions.

Does Strkr handle factory acceptance tests?

Yes. The FAT milestone captures on the deal with scheduled date, OEM participants (application engineer, project manager, test lab lead), customer participants (customer engineering lead, operations representative, outside integrator if applicable), pre-FAT checklist (configured machine built, representative material staged, test protocol approved, outside integrator notified, customer travel booked), and post-FAT acceptance sign-off. The FAT report lives on the deal with pass/fail against the test protocol, open punch list items, and customer sign-off. Strkr Projects can also carry an install-side site acceptance test (SAT) on the install project when the customer requires it.

How does Strkr handle trade-ins and used equipment?

Trade-ins and used equipment live as custom objects on the deal and the account. The trade-in valuation captures equipment make, model, year, condition, as-is value, after-recondition value, buyback obligation, and target resale window. Used equipment inventory lives as a custom object on the account level with pedigree (original owner, hours of operation, service history), reconditioning status, and asking price. The AE sees the full transaction economics on the deal record. The operations team manages the used equipment pipeline on real data instead of a Q4 reconciliation. For OEMs that run a dedicated used equipment business unit, the custom object can lift into its own pipeline board.

What is the right starting point for an industrial equipment OEM evaluating Strkr?

Start with the capital equipment pipeline board, the Products module for configured equipment, and the service agreement attach on the deal record. Those three primitives alone resolve the most expensive pains the role carries, which are quote accuracy against a configured machine, service agreement forecast visibility, and attach-rate discipline. Layer in the FAT and capex milestone capture in week two to tighten pipeline accuracy. Turn on the ERP connector (NetSuite, Epicor Kinetic, Infor CloudSuite Industrial, Dynamics 365 Business Central, SAP S/4HANA Public Cloud) in week three. Turn on Strkr Projects for install coordination at Order Booked. The pricing page lays out the per-seat line at Starter 29 dollars per seat per month, Pro 59, and Scale 119, plus the AI 49 dollar add-on module. Industrial equipment AE installs typically run Pro seats for the AE roster.

Try it free. Bring your team next week.

No sales call, no migration consultant, no four-month implementation. Enter your card, get 14 days of the full Pro tier, cancel any time before day 14 with zero charge. Spin up a workspace, import your CSV, and have something useful before lunch.