Can Strkr handle a configured machine with 60 options and option-dependency logic?
Yes. The Strkr Products module supports configured line-item quoting with option-dependency rules on the admin surface. Industrial equipment OEMs regularly build quotes with 40 to 100 configured line items across base model, options, accessories, consumables, and services. Option-dependency rules (option 23 requires option 11, voltage 480V constrains discharge direction, control package B excludes HMI language Mandarin) run on the admin surface, so the AE never ships a quote the engineering team flags as impossible. The quote PDF renders clean for the customer, and the margin sheet renders for internal review with gross margin on every option.
How does the service agreement forecast work?
Service agreements live on the deal as Products module components with term (1, 3, 5 year), payment schedule (annual, quarterly, monthly), covered services, and renewal cadence. The forecast report pulls capex revenue, service agreement annual contract value, and parts annuity on the same deal record. The AE forecasts total contract value, not just the capex. The service manager pulls the renewal queue off the Products renewal cadence field instead of a Q4 Excel reconciliation. For OEMs running a separate service agreement management system, Strkr Flow integrates both directions so the Products module is the forecast surface and the service system is the delivery system.
How does install coordination work after the PO signs?
At Order Booked, a Strkr Projects workspace spins up for the equipment delivery and install with milestones for engineering release, equipment production, shipment, site arrival, mechanical install, electrical install, commissioning, site acceptance test, customer sign-off, and service agreement activation. The AE sees the install status on the account record without opening the OEM project management tool. The install coordinator updates milestones against the project and the AE answers the customer status call in 30 seconds. For OEMs with install teams running on Microsoft Project or Smartsheet, Strkr Flow syncs milestones both directions.
Does Strkr handle factory acceptance tests?
Yes. The FAT milestone captures on the deal with scheduled date, OEM participants (application engineer, project manager, test lab lead), customer participants (customer engineering lead, operations representative, outside integrator if applicable), pre-FAT checklist (configured machine built, representative material staged, test protocol approved, outside integrator notified, customer travel booked), and post-FAT acceptance sign-off. The FAT report lives on the deal with pass/fail against the test protocol, open punch list items, and customer sign-off. Strkr Projects can also carry an install-side site acceptance test (SAT) on the install project when the customer requires it.
How does Strkr handle trade-ins and used equipment?
Trade-ins and used equipment live as custom objects on the deal and the account. The trade-in valuation captures equipment make, model, year, condition, as-is value, after-recondition value, buyback obligation, and target resale window. Used equipment inventory lives as a custom object on the account level with pedigree (original owner, hours of operation, service history), reconditioning status, and asking price. The AE sees the full transaction economics on the deal record. The operations team manages the used equipment pipeline on real data instead of a Q4 reconciliation. For OEMs that run a dedicated used equipment business unit, the custom object can lift into its own pipeline board.
What is the right starting point for an industrial equipment OEM evaluating Strkr?
Start with the capital equipment pipeline board, the Products module for configured equipment, and the service agreement attach on the deal record. Those three primitives alone resolve the most expensive pains the role carries, which are quote accuracy against a configured machine, service agreement forecast visibility, and attach-rate discipline. Layer in the FAT and capex milestone capture in week two to tighten pipeline accuracy. Turn on the ERP connector (NetSuite, Epicor Kinetic, Infor CloudSuite Industrial, Dynamics 365 Business Central, SAP S/4HANA Public Cloud) in week three. Turn on Strkr Projects for install coordination at Order Booked. The pricing page lays out the per-seat line at Starter 29 dollars per seat per month, Pro 59, and Scale 119, plus the AI 49 dollar add-on module. Industrial equipment AE installs typically run Pro seats for the AE roster.