The 32 rep team ending the Friday fire drill.
A 32 rep team ran a Friday pipeline fire drill because the forecast number was called in on Thursday and the pipeline reality did not match. Strkr onboarding configured the Monday prep workflow with AI talking points per deal, the three category forecast with Friday noon lock, and the aging red view as the first thing in the review. By quarter three the Friday fire drill ended. Forecast accuracy improved 18 points.