How-to guide

How to run an enterprise proof-of-value

A proof-of-value is not a free trial. It is a scoped, time-boxed engagement where the buyer tests your product against written success criteria that both sides agreed before kickoff. Done well, a PoV closes with signature inside 60 days. Done poorly, it drags into a four-month exercise where the buyer uses your product for free and never signs. This guide walks through scoping, success criteria, timeline, decision gates, and the exit meeting that converts the PoV into a signed contract.

Before you start

What you need.

Time: 30 to 60 days of engagement, 2 weeks of prep

  • A qualified opportunity above the enterprise ARR threshold.
  • An executive sponsor on the buyer side committed to the exit decision.
  • A dedicated solutions engineer or implementation partner on your side.
  • Legal review of the PoV terms before kickoff.
Run an enterprise proof-of-value engagement

Step by step.

  1. 1

    Scope the PoV before saying yes

    The first mistake every PoV makes is agreeing before scoping. Before you commit to a PoV, confirm four things in writing. One, the specific business outcome the buyer wants to prove. Two, the written success criteria that will determine whether the PoV passes. Three, the executive sponsor who will make the final buy decision based on the results. Four, the budget authority and the signature path if the PoV passes. If any of these is fuzzy, run a 60-minute scoping call with the buyer first. A PoV without a signature path is just a free pilot and almost never closes.

    • Business outcome in the buyer's words.
    • Written success criteria.
    • Named executive sponsor and buy decision owner.
    • Budget and signature path confirmed.
  2. 2

    Write the success criteria as pass/fail tests

    Success criteria that read like aspirations are not criteria. "Improve team efficiency" is an aspiration. "Reduce time-to-close by 15 percent across 10 pilot opportunities compared to the 90-day baseline" is a criterion. Each criterion has a metric, a threshold, and a measurement window. Both sides sign the criteria before kickoff. Signed criteria are the exit framework. At the final meeting, the room asks whether each criterion passed or failed. If every criterion passed, the deal closes. If criteria are ambiguous, the exit meeting becomes a negotiation and the deal usually slips.

    Tip: A good criterion is one both sides could score the same way without looking at each other. If the scoring is subjective, rewrite it.
  3. 3

    Time-box the engagement

    Pick an end date before the PoV starts. 30 days for a focused test, 60 for a multi-team pilot, 90 at the outside for an enterprise with multiple integrations. Longer than 90 and the PoV is a free pilot. The end date is not negotiable. If the buyer wants to extend, both sides renegotiate the terms and the signature path. Published end dates force both teams to make progress. Open-ended PoVs produce "we are still evaluating" responses six months in. Attach the end date to the signed success criteria and refer to it in every weekly working session.

  4. 4

    Build the timeline with decision gates

    Lay out the 30 to 60 days as a timeline with decision gates every two weeks. Day 1: kickoff with success criteria signed. Day 14: first measurement checkpoint with the executive sponsor. Day 30: midpoint review with go, no-go, or pivot. Day 45: late-stage inspection with signature planning. Day 60: exit meeting with the final decision. The gates keep the engagement from drifting. If the midpoint shows the PoV is failing, the buyer and seller know with 30 days to fix it. If the midpoint shows it is passing, legal and procurement work can start in parallel so signature is ready at day 60.

    • Day 1: kickoff with signed criteria.
    • Day 14: first measurement checkpoint.
    • Day 30: midpoint go/no-go/pivot.
    • Day 45: late-stage inspection.
    • Day 60: exit meeting with decision.
  5. 5

    Assign named owners on both sides

    Every PoV needs a named owner on each side with authority to make decisions during the engagement. On the buyer side: an implementation lead and the executive sponsor. On your side: an AE and a solutions engineer or implementation partner. Four people. The owners meet weekly. Side conversations between other stakeholders feed up through the owners rather than bypassing them. PoVs with ambiguous ownership on either side drift. If the buyer-side implementation lead changes mid-PoV, pause and restart the clock. A new owner with no history will not deliver the PoV on time.

  6. 6

    Run a weekly working session, not a status call

    The weekly session is a working session, not a status recital. The format: 10 minutes on progress against each success criterion, 20 minutes working through blockers (data access, integration bugs, user adoption), 10 minutes on the next week's commitments. The buyer-side implementation lead and your SE both come with specific issues. The AE and the sponsor attend less often, maybe every other week. Working sessions produce decisions. Status calls produce reports. The PoV needs decisions.

  7. 7

    Pre-brief the exit meeting at day 45

    At day 45, run a pre-brief with the executive sponsor on both sides. Walk the current status of each success criterion. Signal whether the PoV is tracking to pass. If it is, start the paper process in parallel: legal review, procurement intake, signature authority. If it is tracking to fail, name the specific gaps and whether they can be closed in 15 days. The pre-brief prevents surprises at the exit meeting. A buyer who hears "the PoV passed" for the first time at the exit meeting has not been bringing legal and procurement along, and the deal slips another 30 days for paper even if the technical decision is yes.

    Tip: The gap between technical yes and signature yes is where most PoVs die. Close it at day 45.
  8. 8

    Run the exit meeting with the signature decision on the agenda

    The exit meeting is the final gate. The agenda has three items. One, walk every success criterion and score pass or fail with evidence. Two, name any criterion that was close and whether it affects the decision. Three, confirm the signature path. If the PoV passed, the exit meeting ends with signature committed inside 10 business days (paper already in motion from the pre-brief). If it failed, the meeting ends with a decision on whether to extend with new criteria, pivot to a different scope, or close out. Open-ended "we will think about it" is not a valid outcome. Every exit meeting ends with a decision.

    • Score every criterion with evidence.
    • Name close calls.
    • Confirm signature path and date.
Avoid

Common mistakes.

  • Agreeing to a PoV before scoping the success criteria.
  • Writing success criteria as aspirations rather than pass/fail tests.
  • Leaving the end date open. PoVs with no end date become free pilots.
  • Running weekly as status calls instead of working sessions.
  • Skipping the day 45 pre-brief. The gap between technical yes and signature yes closes deals.
FAQ

Frequently asked questions.

How long should an enterprise PoV be?

30 days for a focused test, 60 for a multi-team pilot, 90 at the outside for a complex integration. Longer than 90 and the PoV becomes a free pilot. The end date is signed into the engagement, not negotiable mid-stream.

What makes a good success criterion?

A metric, a threshold, and a measurement window. Both sides can score it the same way without looking at each other. "Reduce time-to-close by 15 percent across 10 pilot opportunities over 45 days compared to the 90-day baseline" is a good criterion. "Improve team efficiency" is not.

Should the PoV be free?

Enterprise PoVs are typically free of license cost but include setup fees for integrations or data loading. The buyer pays for the implementation effort, which creates skin in the game and keeps the PoV from drifting. Fully free PoVs with no setup fee tend to drag longer and close less often.

What if the PoV fails at the midpoint?

The midpoint review gives three options: continue (with specific plan to close the gap), pivot (change the criteria to match what the product can prove), or close out. Dragging a failing PoV to day 60 damages both reputations. Make the decision at day 30.

How does Strkr help run an enterprise PoV?

Strkr lets the AE and SE track the PoV against the opportunity record, store the signed success criteria, and run the weekly working sessions off a shared account view. Strkr AI can also summarize weekly activity into a two-line sponsor brief for the executive-level readouts.

See it in Strkr

Related product surfaces.

Strkr CRM All Strkr features

Run PoVs off the opportunity record

Strkr stores the signed success criteria, tracks the weekly working-session commitments, and surfaces the midpoint and exit decisions on the opportunity record. Strkr AI drafts the sponsor brief for the executive readouts.

Try it free. Bring your team next week.

No sales call, no migration consultant, no four-month implementation. Enter your card, get 14 days of the full Pro tier, cancel any time before day 14 with zero charge. Spin up a workspace, import your CSV, and have something useful before lunch.