How does Strkr handle drawing revisions across a 60-to-150-day fab cycle?
Strkr Docs holds every drawing revision on the deal record with version history, publish date, revisions-since-last-quote flag, and the customer engineering contact who sent each version. When a new drawing attachment lands on an email, Strkr Flows auto-log the file as a drawing revision, flag the quote if the revision supersedes the one the quote was built against, and drop a quote-stale alert on the AE dashboard with the delta called out. The shop foreman can audit the drawing arc after routing starts, so a Rev A quote never ships against a Rev C fabrication order. For jobshops running a formal engineering-change-order process, the drawing revision supports an ECO link field.