Built for Custom Fabricator Account Executives

The CRM for the custom fab AE quoting from drawings and handing clean to the shop floor.

AEs at custom-fabrication jobshops (metal, wood, plastic, composite, machining, millwork) run 60 to 150 day quote-to-fabricate cycles with drawings that revise three times, prototype runs that reshape pricing, and a shop floor that needs a clean handoff on PO signature. Strkr collapses that into one workspace with drawing revisions, BOM line-item quoting, prototype-run tracking, and Projects handoff to the shop.

Why buyers are here

Custom fabrication Account Executives: the daily pains.

A custom fabrication AE runs a different week than a product-sales AE or an industrial-distribution AE. Every deal starts with a drawing from the customer engineering team and runs through three to five drawing revisions before a quote lands. Pricing depends on the shop capacity assumptions nobody except the production manager can defend, and prototype runs often reshape the pricing by 15 to 30 percent before a production PO arrives. The AE lives in Outlook attachments, a shared drive for drawings, a QuickBooks estimate module for quoting, an ERP for part numbers, and the production manager cell phone for shop-capacity reality checks. The six pains below show up on every custom-fab AE call we take, and each one maps to a surface Strkr collapses by default.

Drawing revisions scattered

Rev C of the drawing is on three machines and no record of truth.

Every custom-fab deal cycles through three to five drawing revisions as engineering refines tolerances, procurement questions a material callout, and the customer requests a design change. The current revision lives in a shared drive the AE forgets to check, in an Outlook attachment the shop foreman pulled last Tuesday, and in a Dropbox link the customer sent that nobody downloaded. Strkr Docs holds every drawing revision on the deal record with version history, so the quote math never runs off Rev A when procurement is on Rev C.

BOM pricing per quote

Every quote carries a bill of materials and nothing fits native.

A custom-fab quote is not a single ACV line. It is 12 to 200 line items across raw material (steel plate, aluminum extrusion, hardwood blank), machined parts, purchased components, assembly labor, finishing, and freight. Salesforce Opportunity line items were built for software seats. Strkr Products ships line-item quoting with BOM support, part-number lookup, revision tracking, and margin math on every row and every quote.

Prototype run reshapes pricing

The prototype takes 40 percent longer and the production PO prices wrong.

Most custom-fab deals carry a prototype run before a production PO lands. The prototype routes through the shop, actual hours get captured, and the AE discovers the hours ran 40 percent over the quote estimate. If the AE closes the production PO at the quoted price, the shop loses 20 points of margin. Strkr tracks prototype actuals on the deal record and surfaces the delta against quote so the AE renegotiates the production PO on evidence instead of discovering the margin erosion after the shop runs the full job.

Shop capacity opaque

The AE promises a 12-week delivery and the shop is at 15 weeks.

The AE promises a lead time to win the deal, and the shop capacity depends on four open jobs the production manager is already juggling. The AE calls the production manager cell phone, gets a verbal "we can swing it," and discovers in week eight that the shop is 15 weeks out. Strkr integrates with the ERP capacity view and surfaces live shop load on every quote, so the lead time quoted matches the lead time the shop can hit.

Shop routing handoff gap

PO signs and the shop foreman starts from a blank router.

The AE wins the production PO and the shop foreman starts routing with a blank router sheet, pulling drawings from the shared drive, part numbers from the ERP, and work-instructions from a Google Doc. Strkr Projects spins up on PO signature with drawings carried over, BOM line items attached, prototype actuals pre-populated, routing operations suggested, and the shop foreman assigned so the hand-off is a status change, not a 90-minute rebuild from source.

Rep and job-shop commission split

The deal pays a manufacturer rep agency plus an outside engineer.

Many custom-fab deals come through a manufacturer rep agency on commission plus an outside design-engineer who brought the opportunity. The AE closes the deal, and a 5 percent rep commission plus a 10 percent design-engineer referral come out of the same order. The spreadsheet that tracks the split is three tabs deep and nobody has edited it since Q2. Strkr custom objects for Rep and Referral Engineer live on every deal with commission and referral math on the record itself.

How Strkr fits the custom fab AE day

The primitives custom fabrication AEs actually use.

Strkr for Custom Fabrication Account Executives is the same CRM every other role at the jobshop runs (production, estimating, shop foreman, operations), with role-aware views and automation shaped around the drawing-driven, prototype-informed, shop-routed motion. The primitives line up with what a custom fab AE repeats on every deal: logging the RFQ with the drawing, pulling part numbers from the ERP master, building the BOM-level quote, routing through estimating and shop-capacity review, running the prototype and capturing actuals, pricing the production PO on evidence, splitting commission with the rep and referral engineer, and handing the closed PO to the shop foreman.

Drawing revision history

Every revision on the deal with version tracking.

Strkr Docs holds every drawing revision on the deal record with version history, publish date, revisions-since-last-quote flag, and the customer engineering contact who sent each version. The quote math never runs off Rev A when procurement is on Rev C, and the shop foreman can audit the drawing arc after routing starts.

BOM line-item quoting

Raw material, machined parts, labor, finishing on every row.

Strkr Products ships line-item quoting with BOM support: raw material (steel plate, aluminum extrusion, hardwood blank), machined parts, purchased components, assembly labor, finishing, and freight. Each row carries quantity, unit cost, markup, and margin. The quote math holds together even on a 200-line fabrication.

Prototype run tracking

Prototype actuals on the deal with delta against quote.

Each deal carries a prototype run record with planned hours per operation, actual hours per operation (synced from the shop time-sheet), and the delta against quote. The AE renegotiates the production PO on evidence when the prototype runs 40 percent over the quote estimate.

Shop capacity integration

Live shop load visible on every quote.

Strkr integrates with the ERP capacity view and surfaces live shop load on every quote. The AE promises a lead time that matches the lead time the shop can hit. For jobshops with multiple cells (laser, press, CNC, finishing), the capacity view breaks down by cell so the AE spots the cell at 95 percent before promising a lead time that depends on it.

Part Number custom object

Part numbers lookup from the ERP master.

Strkr custom objects give every tenant a native Part Number object with lookup fields on quotes, BOM lines, and deals, plus bi-directional sync to the ERP master. The AE searches part numbers from the Products module to build a quote.

Rep and Referral Engineer objects

Commission and referral math on the deal.

Custom objects for Rep and Referral Engineer live on every deal with commission and referral math on the record itself. The AE opens a deal and sees the net margin after rep commission and referral share without opening a 3-tab commission spreadsheet nobody has updated.

Projects handoff

PO signs, Projects spins up with full context.

Strkr Projects spins up on PO signature with drawings carried over, BOM line items attached, prototype actuals pre-populated, routing operations suggested, and the shop foreman assigned. The hand-off is a status change, not a 90-minute rebuild from source.

Strkr AI deal risk

The deal where silence looks competitive, flagged.

Strkr AI reads deal activity, email tone, drawing cadence, prototype status, and quote age, then flags deals where the silence pattern looks competitive. The AE acts on a specific gap instead of a vague Monday worry about the open book.

What Strkr automates for a custom fab AE

The repeatable work the CRM should do before Monday.

The best custom fabrication AEs are the ones who automate the repeatable moves and spend the week on customer-engineering conversations and shop-foreman alignment. Strkr Flows handle the dozen automations every custom fab AE should run, and each one ships as a native trigger with no webhook plumbing. The pattern below is what shows up in week two of every mid-sized jobshop deployment.

Drawing revision ingest

A new drawing attachment auto-logs as a revision.

When the customer engineering team emails a new drawing attachment, the flow logs the file as a drawing revision on the deal record with the sender, the revision letter if detected, and a flag on the quote if the revision supersedes the one the quote was built against.

Quote-stale alert

Quote older than 14 days with new drawing surfaces.

When a new drawing revision lands on a deal that has a quote older than 14 days, the flow drops a flag on the AE dashboard with the drawing delta called out and the quote recalculation suggested. The AE recalculates the quote on current geometry before the customer notices the version mismatch.

Prototype actuals sync

Shop time-sheet feeds prototype actuals on the deal.

When the shop time-sheet captures hours against a prototype operation, the flow syncs the actuals to the deal prototype record and calculates the delta against planned hours. The AE walks into the production PO conversation with evidence instead of a hunch.

Shop capacity nudge

Lead time promised versus shop load, flagged.

When the AE promises a lead time on a deal that depends on a cell currently at 85 percent or higher, the flow drops a nudge on the AE dashboard with the capacity gap called out and the production manager tagged. The lead time conversation happens before the deal closes.

PO signature flow

Signed PO triggers Projects spin-up.

PO signature triggers a flow that spins up an engagement in Strkr Projects with drawings carried over, BOM line items attached, prototype actuals pre-populated, routing operations suggested, and the shop foreman assigned. The hand-off is a status change.

Rep commission notification

Deal close triggers rep notification with commission math.

When a deal closes, the flow notifies the rep agency and the referral engineer with the final deal size, the commission math, and the expected payout. The commission conversation stays on the record instead of a quarterly reconciliation call with the rep agency.

Risk-flag digest

Monday email, five deals, two paragraphs each.

Monday 7 AM email: the top five Strkr AI risk-flagged deals with the specific reason per deal and a suggested next-step. The AE walks into the Monday pursuit review with the risk list in hand.

Repeat-customer renewal

Account with repeat-fab pattern gets a reorder nudge.

When an account has run three or more repeat fabrications of a similar BOM shape, the flow drops a reorder nudge on the AE dashboard with the historical BOM pre-attached. The repeat-fab motion runs on a cadence instead of waiting for the customer to call.

What an AE sees that the shop does not

The AE tier that respects the shop workspace.

An AE tier that creates a parallel UI the shop cannot see is a tier that breeds mistrust on the production floor. Strkr keeps the workspace identical for AE and shop, then adds an AE-only overlay for the deal pipeline, quote history, margin visibility, rep commission math, and private customer notes.

Deal pipeline

Every open fab deal on one view.

The AE pipeline shows every open fabrication deal grouped by stage with drawing revision, quote amount, prototype status, shop capacity flag, and close date on every row. Filter by product line, customer, deal size, or margin band.

Quote history per account

Every quote this account has carried, in one view.

Each account carries a quote history view with every past quote (dates, line items, final price, delivered or lost), so the AE pricing a repeat fab opens the account and sees the pricing arc before building a new quote.

Margin visibility

Every deal margin visible to the AE.

The AE sees margin on every deal with raw material cost, labor cost, finishing cost, rep commission, referral engineer share, and net margin. Sort pipeline by net margin band to spot the deal priced too thin before shop-routing starts.

Rep commission math

Commission and referral payout on every deal.

The AE opens a deal and sees the rep commission (percent of deal, dollar amount, trigger date) and the referral engineer share on the record itself. The commission conversation stays on the record.

Private customer notes

AE notes shop does not see.

Notes captured during a customer conversation can be marked private to the AE or shared with the shop. Private notes feed the account annual review. Shared notes become visible to shop foreman with action items queued.

Risk-flag inbox

Strkr AI deal flags, in one list.

Every Strkr AI deal risk flag across the AE book lands in a risk inbox. The AE triages each flag in two clicks: dismiss (false positive), schedule next-step (creates a task tied to the deal), or escalate (routes to the sales manager with the flag history attached).

Deal timeline

Drawing revisions, quotes, prototype, PO, in order.

The deal timeline captures every drawing revision, quote version, prototype actual, PO signature, and shop routing event across the deal lifetime. The AE opens a repeat customer and reads the full engagement arc in two minutes.

Head-to-head

Strkr vs Salesforce plus shared drive plus ERP capacity plus commission sheet.

Most 20 to 150 person custom fab jobshops stick the AE with Salesforce (or no CRM at all) for records, a shared drive for drawings, the ERP for part numbers and capacity, a QuickBooks estimate module for quoting, an Outlook rules folder for RFQ intake, and a Google Sheet for rep commissions. The stack is six surfaces and the AE spends two days a week stitching them together. Strkr collapses that into one workspace with one bill.

What matters Strkr Salesforce + drive + ERP + QBO + Sheet
Number of surfaces the AE opens for a quote 1 (Strkr) 6 (Salesforce, drive, ERP, QBO, Outlook, Sheet)
Drawing revision history Native revision tracking on the deal Shared drive hunt that fails every third try
BOM line-item quoting Native line-item quoting with margin math QuickBooks estimate module or Excel template
Prototype actuals tracking Native prototype record with delta against quote Shop time-sheet reconciled by hand quarterly
Shop capacity on quote Live ERP capacity view on every quote Production manager cell-phone verbal
Part Number custom object Native with ERP bi-directional sync ERP in a second browser tab
Rep commission math Native custom object on every deal Google Sheet reconciled quarterly
Projects handoff Spins up on PO signature with full context Shop foreman starts from blank router
Deal risk flags Native Strkr AI flags with specific reasons AE eyeballs the pipeline Monday morning
Monthly cost per seat (stack) One per-seat line, see pricing page Five to six per-seat lines stacked

See the CRM built for the custom fabrication AE.

Start a trial with the full custom fab AE stack enabled: drawing revision history, BOM line-item quoting, prototype run tracking, shop capacity integration, Part Number custom object, Rep and Referral Engineer objects, Projects handoff, Strkr AI deal risk. One bill, one workspace, one source of truth for the quote-to-fabricate motion. Migrate from the Salesforce plus shared drive plus ERP plus commission Sheet stack in an afternoon and keep every account, deal, drawing revision, and prototype actual intact. The pricing page lays out the per-seat line in full.

Common questions

Custom fabrication Account Executives buyer FAQ.

How does Strkr handle drawing revisions across a 60-to-150-day fab cycle?

Strkr Docs holds every drawing revision on the deal record with version history, publish date, revisions-since-last-quote flag, and the customer engineering contact who sent each version. When a new drawing attachment lands on an email, Strkr Flows auto-log the file as a drawing revision, flag the quote if the revision supersedes the one the quote was built against, and drop a quote-stale alert on the AE dashboard with the delta called out. The shop foreman can audit the drawing arc after routing starts, so a Rev A quote never ships against a Rev C fabrication order. For jobshops running a formal engineering-change-order process, the drawing revision supports an ECO link field.

Can Strkr handle a quote that is a 200-line bill of materials?

Yes. Strkr Products ships line-item quoting with BOM support: raw material, machined parts, purchased components, assembly labor, finishing, and freight. Each row carries quantity, unit cost, markup, and margin. The quote math holds together even on a 200-line fabrication, and the Part Number custom object looks up from the ERP master so the AE searches part numbers from the Products module to build a quote. For jobshops running multiple customer price lists or tiered pricing, the Products module supports price-list configuration per account.

How does prototype-run tracking actually work?

Each deal carries a prototype run record with planned hours per operation (synced from the quote), actual hours per operation (synced from the shop time-sheet), and the delta against quote. When shop hours capture against a prototype operation, Strkr Flows sync the actuals to the deal prototype record and calculate the delta. The AE walks into the production PO conversation with evidence (prototype ran 40 percent over quote estimate on the laser operation) instead of a hunch. The AE renegotiates the production PO on evidence, which stops the 20-point margin erosion that happens when the production PO prices against prototype assumptions that turned out to be optimistic.

Can the AE see live shop capacity when quoting a lead time?

Yes, through the ERP integration. Strkr surfaces live shop load on every quote, with capacity breakdowns per cell (laser, press, CNC, finishing). The AE promises a lead time that matches the lead time the shop can hit, and Strkr Flows drop a nudge on the AE dashboard with the capacity gap called out when the AE promises a lead time that depends on a cell currently at 85 percent or higher. The production manager cell phone retires as the capacity source of truth.

How does the handoff to the shop floor actually work on PO signature?

PO signature triggers a flow that spins up an engagement in Strkr Projects with drawings carried over, BOM line items attached, prototype actuals pre-populated, routing operations suggested, and the shop foreman assigned. The hand-off is a status change, not a 90-minute rebuild from source. For jobshops running a formal ERP work order on top of Strkr Projects, the integration pushes the work order into the ERP with full context, so the shop foreman opens either surface and sees the same drawings, BOM, routing, and prototype learnings.

What does Strkr cost for a 40-person custom fab jobshop with four AEs?

Starter is $29 per seat per month, Pro is $59, and Scale is $119. Most 40-person custom fab jobshops land on Pro for the Products module, Projects module, and custom-object support for Part Numbers, Reps, and Referral Engineers. For 40 seats that is $2,360 per month on Pro. The Strkr AI module is an opt-in $49 per month that includes 5,000 Strkr AI calls, which covers risk-flag digests, drawing-revision ingest draft summaries, and repeat-fab reorder prompts for a shop this size with headroom. The 14-day trial includes every surface so the AE team can quote a live job through Strkr before the first invoice lands.

Try it free. Bring your team next week.

No sales call, no migration consultant, no four-month implementation. Enter your card, get 14 days of the full Pro tier, cancel any time before day 14 with zero charge. Spin up a workspace, import your CSV, and have something useful before lunch.