Built for construction operators producing quotes with material and markup

Construction quoting with live material pricing, honest markup, and assembly-based math.

A construction quote has to add up: material at today's supplier price, labor at the right burden, markup that reflects risk and margin targets, and assembly logic that keeps the math defensible. Strkr's quoting surface pulls material pricing feeds, holds the firm's labor burden rules, and produces assembly-based quotes the estimator can defend.

What this audience is actually dealing with

The pains that bring buyers here.

A construction quote that misses on material pricing by 8 percent and labor burden by 12 percent is a quote that walks margin out the door before the project starts. The six pains below are what breaks when quoting lives in a spreadsheet or a point-tool that does not integrate with the CRM pursuit record. Each one maps to a capability a serious construction quoting surface needs.

Stale material pricing

The lumber price from last quarter in this quarter's quote.

Material prices move. Lumber swings monthly. Steel moves on supplier mill-run cycles. Copper on commodities. A quote built on last quarter's material price can miss by 10 to 20 percent on a line. Estimators who maintain pricing manually spend 2 to 4 hours per quote updating. Estimators with supplier-feed-driven pricing spend 10 minutes. The time compounds.

Labor burden drift

The burden rate from three years ago still in the formula.

Labor burden (payroll taxes, workers comp, health insurance, retirement, vacation accrual) drifts year over year. A burden rate set at 32 percent three years ago may be 41 percent today. Quotes running the old rate miss margin by 9 percentage points on labor. The firm wins bids and loses margin. The right CRM holds burden rates with annual review discipline.

Markup logic inconsistency

The quote where each estimator applied different markup.

Markup logic across a quote (material markup, labor markup, equipment markup, sub markup, bond and insurance markup) tends to drift across estimators. Each estimator has their own habits. The firm quotes inconsistently. The right CRM codifies markup logic in a firm-wide quote template so every quote applies the same ruleset.

Takeoff-to-quote gap

The takeoff done in Bluebeam that nobody can trace to the quote.

A takeoff done in Bluebeam, PlanSwift, or On-Screen Takeoff produces quantities. The quantities drop into the quote spreadsheet manually. The traceability from takeoff item to quote line gets lost. Later audits cannot defend the quote. The right workflow holds the takeoff and the quote in a traceable pairing.

Supplier quote assembly

The pile of PDFs from eight suppliers in an email folder.

A material-heavy quote (MEP, millwork, structural steel) pulls from eight or more supplier quotes that come in as PDFs in email. The estimator extracts the pricing manually. Mistakes happen. The right workflow holds supplier quote PDFs attached to the quote line items with the extracted pricing visible.

Revision tracking

The quote at revision 4 that nobody knows what changed.

Construction quotes revise frequently during the pursuit window. By revision 4 or 5, the team no longer knows what changed between revisions. The right CRM holds revision history on the quote with specific change-tracking (added lines, removed lines, price updates, markup changes). The estimator can defend any revision in minutes.

The Strkr quoting surface

What runs inside the CRM for construction quotes.

The cards below walk the quoting features Strkr ships for construction. Each is designed to produce defensible quotes faster than spreadsheet workflows.

Material price feeds

Live supplier pricing on the quote line.

Strkr integrates with material supplier price feeds (US LBM, Nations Roof, Carrier, local suppliers through EDI or API) to pull current pricing onto quote lines. The estimator sees today's price with the supplier source. For commodity items (lumber, steel, copper), the feed updates daily. For specialty items, the feed updates per supplier's schedule.

Labor burden rules

Firm-wide burden tables with annual review.

Strkr holds the firm's labor burden rules in a central table: payroll taxes by state, workers comp by trade and state, health insurance by role tier, retirement contribution, vacation accrual. Every quote applies the current burden ruleset. The ops lead reviews burden annually with a one-click update that applies to all new quotes.

Assembly-based pricing

Line items as assemblies, not individual items.

Strkr's assembly logic lets estimators quote in assemblies rather than individual items. A "typical office interior assembly" rolls up framing, drywall, finish, electrical rough, electrical devices, fire protection sprinklers, ACT ceiling, flooring, and base. The assembly price auto-calculates from current material and labor rates. Modifications apply to individual lines inside the assembly.

Markup logic engine

Firm-wide markup rules per cost category.

Markup logic codifies in Strkr: material at X percent, labor at Y percent, equipment at Z percent, sub quotes at pass-through plus coordination fee, bond at W percent of total, insurance at V percent of total. The engine applies the firm-wide rules by default with estimator overrides available with reason-code tracking. The consistency drives defensible pricing across the firm.

Takeoff integration

Bluebeam and PlanSwift feed quantities to Strkr.

Strkr integrates with Bluebeam, PlanSwift, On-Screen Takeoff, and other takeoff tools through import or API. Takeoff quantities flow to the quote line items with the takeoff item traceable to the quote. The audit trail covers how each quantity got into the quote, which is a operational asset for post-award audits and change-order justification.

Supplier quote attachment

PDFs and pricing attached to quote lines.

Supplier quote PDFs attach to specific quote lines with the extracted pricing visible. When a supplier sends a revised quote, the attachment and pricing update on the quote line. The audit trail covers which supplier provided which price when, which closes the "where did this price come from" question that drives margin disputes at award time.

Revision tracking

Every revision carries diff from the prior version.

Each quote revision records as a dated version with a diff from the prior version: added lines, removed lines, price updates, markup changes, scope narrative changes. The estimator can defend any revision in minutes. The pursuit team can see what moved between client-facing versions and what moved internally.

Quote-to-contract conversion

Won quote becomes the contract document.

When a quote wins, Strkr converts it into the contract document (or feeds the contract document) with the line items, the schedule of values, the inclusions, and the exclusions. The contract maintains traceability to the winning quote revision. Any discrepancies between what was quoted and what gets contracted surface immediately for correction.

Material pricing feed integrations

The supplier integrations that keep pricing current.

The cards below walk the supplier integrations Strkr ships. Each is designed to produce current pricing without the manual update burden.

Lumber and framing

US LBM, Builders FirstSource, local yards.

Lumber and framing feeds pull daily pricing on dimensional lumber, engineered lumber (LVL, PSL), sheathing, and framing hardware. The pricing shows per the firm's preferred supplier with alternates visible. Regional variations (gulf coast cypress versus northern hard maple) handle through geographic configuration on the quote.

Steel and structural

Nucor, SteelFab, local service centers.

Steel feeds pull weekly or mill-run cycle pricing on structural shapes, plate, pipe, tubing, and rebar. The pricing accounts for mill location, service center markup, and delivery radius. For hard-to-source specialty items, the feed surfaces lead-time flags that affect project schedule.

MEP equipment

Carrier, Trane, Daikin, Rheem for HVAC. Rexel, Graybar for electrical.

MEP equipment feeds pull manufacturer list pricing with the firm's negotiated discount applied. Carrier, Trane, Daikin, and Rheem for HVAC equipment. Rexel and Graybar for electrical gear and devices. The feeds account for current lead times on commercial equipment which has stretched 20 to 40 weeks post-pandemic for custom orders.

Roofing materials

GAF, Firestone, Carlisle, Johns Manville.

Roofing feeds pull current pricing on membrane roofing systems (TPO, EPDM, modified bitumen, PVC), insulation, flashings, and accessories. The feeds carry warranty-dependent pricing (10-year versus 20-year warranty assembly) and installer-certification requirements that affect labor rates.

Flooring materials

Shaw, Mohawk, Armstrong, Mannington.

Flooring feeds pull current pricing on carpet tile, broadloom, LVT, ceramic tile, and hardwood. The feeds account for pattern-dependent waste factors and installer-certification requirements. Backing types and acoustic ratings surface as line-item attributes.

Local supplier EDI

Local suppliers through EDI or API.

For local suppliers without native integrations, Strkr supports EDI feeds (common in commercial building materials) and generic API connections. The integration setup is a one-time project typically done during initial Strkr implementation. Once live, the local supplier feeds behave the same as the major integrations.

The assembly library pattern

How a mature construction firm builds its assembly library.

Firms that invest in a tight assembly library produce quotes 60 to 80 percent faster than firms that quote from line-item scratch. The cards below walk the pattern.

Base assemblies by project type

Twelve to twenty assemblies that cover 70 percent of quotes.

Most construction firms find that twelve to twenty assemblies cover 70 percent of their quote volume: typical office interior, typical retail buildout, typical warehouse envelope, typical restaurant kitchen, typical medical procedure room, typical school classroom. The investment to build these assemblies is 60 to 120 hours up front. The payback is 2 to 4 hours of quoting time per subsequent quote.

Specialty assemblies

Niche assemblies for specific project categories.

Beyond the base assemblies, firms with specialty niches (clean rooms, kitchen hoods, data center shells, pharmacy compounding rooms) build specialty assemblies that reflect their expertise. The specialty assemblies become a competitive asset: faster quote turnaround with accurate pricing for a niche most competitors cannot bid efficiently.

Modifier logic

Assemblies adapt to project-specific conditions.

Each assembly carries modifier logic for common project-specific conditions: urban job-site access adds equipment rental and premium labor, LEED certification adds documentation labor and specific product requirements, union jurisdiction applies the correct wage schedule. The modifiers apply through the quote in minutes rather than hours of manual adjustment.

Assembly review cadence

Quarterly review of pricing accuracy.

Every quarter, the quoting lead reviews each assembly for pricing accuracy against actual project costs. Assemblies that quote within 5 percent of actual are solid. Assemblies that quote outside 10 percent get rework. The review drives continuous improvement rather than library drift. Firms that run this discipline produce consistently defensible pricing.

Historical cost calibration

Actual job cost data feeds back to assemblies.

Strkr's integration with the firm's accounting or ERP (Procore, Sage, QuickBooks, Viewpoint) pulls actual job costs by assembly category. The cost data calibrates the assemblies: if typical office interior assemblies consistently come in 7 percent over quoted, the base pricing updates. The calibration loop drives margin discipline.

Risk markup rules

Project-type-specific risk markup logic.

Different project types carry different risk profiles. Historic renovation carries higher scope-discovery risk than new warehouse. Fast-track delivery carries higher coordination risk than conventional. The risk markup rules apply project-type-specific markup percentages that reflect the firm's historical experience. The transparency makes risk pricing defensible to clients who ask why their quote carries a markup.

Quote defensibility and audit

What makes a quote defensible under scrutiny.

The cards below walk what makes a construction quote defensible when a client, surety, or auditor asks how specific numbers were produced.

Line-item source traceability

Every quote line traces to its source.

Every quote line in Strkr traces to its source: takeoff item from Bluebeam with specific page and area reference, supplier quote PDF with specific line, assembly template with specific version, estimator judgment with specific reasoning. The traceability makes any line defensible in minutes.

Burden rate audit

The applied burden rate shows source and date.

The burden rate applied to a quote line shows the burden table version, the effective date, and the components (payroll taxes, workers comp, benefits, vacation). An auditor can verify the burden rate against the firm's HR data in minutes rather than hours of hunting.

Markup reasoning

Markup overrides carry reason codes.

When an estimator overrides the default markup on a quote (higher risk, specific client discount), the override carries a reason code and timestamp. The pattern of overrides reports to management quarterly, which surfaces whether estimators are judging consistently with firm policy.

Supplier quote expiration

Supplier quotes carry expiration dates.

Supplier quote PDFs attached to quote lines carry expiration dates. When an attached supplier quote expires before the pursuit's expected award date, Strkr flags the pursuit so the estimator can refresh the supplier quote. The flag prevents the "we quoted on supplier pricing that expired three weeks ago" surprise at award.

Head-to-head

Strkr quote software versus spreadsheet quoting

The grid below compares Strkr's integrated quoting surface against the spreadsheet-based quoting workflow most construction operators run today.

Feature Strkr Spreadsheet quoting
Material pricing Supplier feeds, daily to weekly updates Manual update, often stale 2-8 weeks
Labor burden Firm-wide table with annual review Hardcoded in spreadsheet formula
Markup logic Engine with firm-wide rules Estimator-by-estimator drift
Takeoff traceability Bluebeam/PlanSwift import Manual re-entry, no audit trail
Supplier quote assembly PDFs attached to quote lines Email folder with PDF pile
Revision tracking Dated versions with diffs Save As "QUOTE_v4_FINAL_FINAL"
Assembly library Firm-wide with modifier logic Everyone has their own copy
Audit defensibility Minutes to defend any line Hours to reconstruct
How teams use Strkr

Construction quoting playbooks worth stealing

The patterns below come from construction operators who moved off spreadsheet quoting to disciplined assembly-based workflows.

The assembly library investment

Build twelve to twenty base assemblies in the first 90 days.

Invest 60 to 120 hours in the first 90 days of Strkr adoption building twelve to twenty base assemblies that cover 70 percent of your quote volume. The payback is 2 to 4 hours of quoting time per subsequent quote across the next 18 months. Firms that skip the assembly library investment produce quotes faster than spreadsheet but miss the compound benefit.

The quarterly assembly review

Every quarter, calibrate assemblies against actual project costs.

Every quarter, pull actual project costs by assembly category from the ERP and compare to the quoted assembly pricing. Assemblies within 5 percent of actual are solid. Assemblies outside 10 percent need rework. The quarterly ritual drives continuous accuracy improvement. Firms running this discipline produce consistently defensible pricing year over year.

The burden rate annual review

Once a year, update the burden table.

Once a year, the ops lead reviews the burden table against current payroll taxes, workers comp rates, health insurance costs, and benefit accrual. The update applies to all new quotes. The discipline keeps burden pricing current rather than drifting multiple percentage points over three years.

The supplier quote expiration discipline

When a supplier quote expires, refresh before responding.

Strkr flags pursuits where attached supplier quotes have expired. The estimator refreshes the supplier quote before responding to the pursuit. The discipline prevents the "we quoted on expired supplier pricing" error that costs margin at award. The flag is automated so it does not depend on the estimator remembering.

The markup override audit

Quarterly review of markup override patterns.

Every quarter, the sales lead reviews markup override patterns across the estimating team: which estimators override high, which override low, what reason codes recur. The review surfaces estimators who need coaching toward firm policy. The transparency keeps markup discipline aligned across the firm.

See Strkr running your next construction quote.

Send us a sample quote from your current workflow and your supplier list. We will set up the material feeds, the burden table, and three base assemblies in one working session.

Common questions

What buyers in this bucket ask most.

Does Strkr replace specialized takeoff software like Bluebeam or PlanSwift?

No, Strkr integrates with Bluebeam, PlanSwift, On-Screen Takeoff, and other takeoff tools. The takeoff tool stays as the specialized measurement surface. Strkr pulls the takeoff quantities into quote line items with traceability back to the takeoff. Estimators who prefer Bluebeam for takeoff continue using it; the quote assembly happens in Strkr.

How does Strkr handle unit price contracts for public works?

Public works contracts often require unit price bidding with specific bid item schedules (DOT item codes, state DOT specifications). Strkr's quote surface supports unit price contract formatting with the required bid item structure. The quote exports in the specified format for electronic bid submission. Historical unit prices feed back from awarded projects for calibration on future bids.

What about guaranteed maximum price (GMP) contracts?

GMP contracts require open-book cost tracking with contingency management. Strkr's quote converts to a GMP contract with the agreed line items, the shared savings formula, and the contingency structure. During the project, actual costs track against the GMP with the owner having visibility to the open-book data. The pattern supports common CM-at-risk and design-build delivery methods.

How does the material pricing feed integration work for suppliers we have special pricing with?

For suppliers with negotiated pricing, Strkr stores the firm-specific pricing agreement alongside the supplier feed. The negotiated discount applies to list pricing automatically. For suppliers who provide project-specific quotes rather than catalog pricing, the quote attachment workflow handles the one-off pricing. Both patterns support without requiring the supplier to change their quoting process.

What about commodity pricing volatility (lumber, steel, copper)?

For commodity items with high volatility, Strkr's quote surface supports a pricing-escalation clause option. The quote can include "material pricing valid for 30 days with escalation clause for lumber and steel per published index" with the index referenced. The clause protects the firm from commodity swings between quote and award. Clients familiar with construction markets accept these clauses as standard.

How does Strkr handle compliance for public works quote data?

Strkr is HIPAA compliant with a BAA available on request, GDPR and CCPA compliant for the EU and California data subjects, and SOC 2 Type II is in progress through 2026-Q4. For public works, the quote audit trail covers DBE participation goals, prevailing wage calculations, and specific state DOT compliance requirements. The audit export generates the required public works documentation in minutes rather than half-day assembly.

Try it free. Bring your team next week.

No sales call, no migration consultant, no four-month implementation. Enter your card, get 14 days of the full Pro tier, cancel any time before day 14 with zero charge. Spin up a workspace, import your CSV, and have something useful before lunch.