Site-walk to signed deposit compressed from 3 days to 4 hours.
An 8-rep residential remodeling GC used to run site walks, go back to the office, rebuild the proposal from phone notes, email the homeowner for a signature, and chase the deposit. Cycle was 3 days. Strkr's mobile site-walk flow with proposal generation on the drive back and Stripe deposit capture at signature compressed the cycle to 4 hours. Close rate lifted because the proposal landed warm.