Site-walk to signed deposit in 4 hours.
A 6-rep residential remodeling GC used to run site walks, go back to the office, rebuild the quote that evening, email the homeowner, and chase the deposit. Cycle was 3 days. The Strkr mobile flow compressed the cycle to 4 hours. Close rate lifted because the quote landed warm.