How is a remodeling CRM different from a construction CRM?
A construction CRM is typically built for new-build residential or light commercial where the owner-to-contractor relationship is formal, the contract is a single document, and the schedule is driven by code-stage inspections. A remodeling CRM has to carry a longer consultative sales cycle (initial consult, in-home measure, paid design agreement, construction contract), a selections-and-allowances surface because residential remodels run heavy on client-selected finishes, a change-order log because scope evolution during an occupied-home remodel is the norm not the exception, and a referral-attribution surface because mature remodelers earn sixty to eighty percent of revenue from past-client word of mouth. Strkr ships the remodeling template out of the box; construction templates are available but they are different pipelines.
Can Strkr handle both the sales side and the construction side?
Yes. The sales pipeline (lead through signed construction contract) and the construction surface (schedule, trade POs, selections, change orders, client approvals, lien waivers, daily field reports) live in the same record. The handoff from sales consultant to project manager fires automatically at contract signing with the handoff checklist. The owner sees one record from first referral touch through final warranty callback, which is the data integrity most remodeling firms lose when they run a sales CRM and a construction tool as separate stacks.
What is the right allowance variance threshold to flag?
The practical threshold depends on firm size and project type, but most mature firms flag when running change orders cross ten percent of contract value and prompt a project-health check-in with the client. Below five percent, change orders are routine scope evolution and clients expect it. Between five and ten percent, running updates in the client portal keep the client aligned. Above ten percent is where client-relationship stress starts, and above fifteen percent is where margin and referral-loyalty both start to erode. Strkr's default threshold alert is ten percent, editable per firm. Some high-end custom-remodelers set it at six percent because their client expectation is tighter; some whole-home gut-renovation firms set it at fifteen percent because discovered-condition change orders are expected on older housing stock.
How does Strkr handle supplier catalog integration for selections?
Strkr integrates with major supplier catalogs via API or bulk-upload (Ferguson, ProSource, Build.com, cabinet manufacturers with public catalog APIs, tile and stone showroom catalogs where available). Supported suppliers feed live pricing and SKU-level specs into the selection sheet so the allowance variance updates automatically. Unsupported suppliers (local showrooms, custom fabricators) are entered manually with the invoice or quote attached for audit. The pricing-source metadata travels with the selection, so the project manager and the client can always trace a selected price back to the originating quote.
How many trade partners can Strkr track for one firm?
There is no practical limit. Mid-size remodeling firms typically maintain fifteen to forty active trade partners across the standard trades plus specialty subs (historic masonry, custom metalwork, structural engineering, acoustic consultants). Strkr tracks license number, workers-comp certificate, general liability certificate, W-9, and renewal dates per trade partner. Expired-insurance alerts prevent scheduling an uninsured sub into an active jobsite. The trade-partner performance scorecard (on-time percentage, on-budget percentage, callback rate, client-rating) runs across all active and retired subs for quarterly performance review.
Does Strkr support draw scheduling and lien waivers?
Yes. Draw schedules attach to the construction contract with milestone-triggered draws (contract signing, demo complete, rough-in complete, drywall complete, substantial completion, final). Each draw ties to a required lien-waiver status: partial waivers from each paid sub at each draw, final waivers from each sub at substantial completion. Missing waivers block the next draw automatically, which protects the firm from a mechanic's-lien surprise ninety days after close. The lien-waiver file closes out clean at final payment and archives with the project.