Built for remodeling and renovation firms

A remodeling CRM where the lead, the design agreement, the construction contract, and the final punch list live in the same record.

Remodeling firms juggle longer sales cycles, consultative design phases, selection sheets, allowances, change orders, and three to six trade partners per job. Generic CRMs treat it like a quote. Strkr treats it like the ninety-day project it actually is, with the client-approval surface the referral word-of-mouth depends on.

What this audience is actually dealing with

The pains that bring buyers here.

The remodeling business is a hybrid of consultative sales, project management, and client-service operations. A kitchen remodel is a $45,000 to $120,000 decision for the homeowner and a six-to-nine-month relationship for the firm. The CRM has to carry the lead through initial consultation, in-home measure, design agreement signing, construction contract signing, selections, pre-construction walkthrough, demo day, mid-project change orders, substantial completion, punch list, and the final referral request. Generic contractor CRMs collapse this into a quote-to-invoice flow and lose the design-build nuance. Remodeling-specific pain points show up in six places on buyer calls: the design-agreement vs construction-contract split, the selections and allowances tracking that drives change orders, the trade-partner coordination surface, the client-approval loop that keeps the referral loyalty intact, the warranty and callback tracking after close, and the project-margin visibility the owner needs to run the business.

Design-agreement vs construction-contract

The two-phase sale that generic CRMs squash into one quote.

A kitchen remodel at a design-build firm typically runs a paid design agreement (five to twelve thousand dollars) that produces drawings and a scope-locked construction contract. The two have different pipelines, different conversion rates, and different cash-flow timing. Generic CRMs treat the whole thing as one quote and lose the design-conversion metric the owner needs to tune lead sources.

Selections and allowances

The $18,000 allowance that drove a $9,000 change order.

Construction contracts include allowances for client-selected finishes (tile, cabinets, countertops, plumbing fixtures, lighting). When the client picks over allowance, the overage becomes a change order. Firms running selections in spreadsheets lose track of what is allowanced, what is selected, and what is overage, which breeds change-order disputes six months in.

Trade-partner coordination

Six trades on one job with three overlapping schedules.

A whole-home remodel pulls electrical, plumbing, HVAC, framing, drywall, flooring, painting, and tile. Each trade has its own schedule, its own PO, its own invoice, and its own lien waiver. Generic CRMs do not model trade partners as a first-class entity, which forces the project manager to run coordination in a parallel spreadsheet or a construction-ops tool that doesn't talk back to the CRM.

Client-approval loops

The referral loyalty depends on the client feeling heard.

Remodeling is a referral business. Seventy percent of revenue at mature firms comes from word of mouth. The referral loyalty comes from the client feeling consulted at every decision point: design approvals, selection sign-offs, change-order acknowledgments, pre-drywall walkthrough. Firms without a client-approval surface fall into email-and-text chaos and the referral loyalty erodes with every missed approval.

Warranty and callback tracking

The two-year warranty that nobody tracked.

Remodeling contracts carry one-to-two-year workmanship warranties. Callbacks for a sticky door, a grouting touch-up, or a cabinet-door adjustment are inevitable. Firms without a callback tracker either overcommit the field crew to free callback hours or push callbacks past the warranty window and damage the referral relationship. Neither outcome is good.

Project-margin visibility

The owner found out the kitchen job lost margin in month seven.

Remodeling margin lives at the project level: estimated gross margin at contract signing, running actual margin through the build, and final margin at close. The owner who finds out the kitchen job underran margin by eleven points at close has lost the chance to course-correct. Firms need running margin visibility by job, not a quarterly post-mortem.

The remodeling pipeline Strkr ships out of the box

A seven-stage pipeline that matches how design-build firms actually sell.

Strkr ships with a remodeling pipeline template that mirrors the design-build sales motion. The stages below are the default; each is editable, but the structure captures how firms running fifty to four hundred jobs a year keep their numbers clean. The pipeline stays separate from the construction pipeline so the design-conversion metric is visible.

Lead captured

Inbound from referral, web form, or showroom walk-in.

The lead stage captures source (referral, website, showroom, Houzz, Google), project type (kitchen, bath, addition, whole-home), rough scope, and timeline. The referral source is a required field because referral-source attribution is the leading indicator of marketing ROI for remodelers.

Qualified consult booked

The in-home consultation with scope confirmed.

A qualified lead has a confirmed in-home consultation on the calendar with a lead designer or sales consultant. The qualifier is budget alignment: the client's stated budget matches the firm's minimum project size. Below the minimum, the lead gets referred out; the referral-out log drives the referral-partner relationship.

Design agreement signed

The paid design phase begins.

The design agreement is the first paid milestone. The client commits five to twelve thousand dollars for drawings, specifications, and scope-locked estimate. The agreement conversion rate from qualified consult is the key marketing metric and typically runs 40 to 65 percent at mature firms.

Design complete

Drawings, specifications, and scope-locked estimate delivered.

The design-complete milestone triggers the construction-contract presentation. The design-to-construction conversion rate typically runs 70 to 85 percent at firms with mature design-presentation discipline. The drop-off at this stage is almost always budget surprise, which signals a design-agreement scoping issue to fix upstream.

Construction contract signed

The scope, schedule, allowances, and payment schedule locked.

The construction contract carries the full scope, schedule, allowances for client selections, payment schedule, and change-order terms. The signed-contract stage triggers the handoff from the sales consultant to the project manager. The handoff checklist (selection sheet, schedule template, trade PO plan) runs automatically on signing.

In construction

Active build with running margin and schedule.

The in-construction stage carries the live project schedule, the trade PO log, the change-order log, the selection-sign-off log, and the running margin against estimate. The project manager has one surface for the week-over-week status; the client has a separate portal view of the approvals they need to make.

Substantial completion

Punch list and final payment.

Substantial completion triggers the final-payment invoice and the punch-list surface. The punch list runs through resolution with photographic sign-off per item. The final-payment-collected stage closes the sales pipeline and opens the warranty window.

Selections, allowances, and change-order discipline

The surface that keeps the client feeling fair and the margin intact.

Change-order disputes are the number one source of client friction in remodeling. The disputes are almost always traceable to selection-and-allowance tracking that broke down somewhere between contract and selection sign-off. Strkr's selections surface keeps the running tally transparent to both sides.

Selection sheet

Every allowanced item with vendor, SKU, and status.

The selection sheet lists every allowanced item (cabinetry, counters, tile, plumbing, lighting, flooring, appliances, hardware, paint) with the allowance amount, the client-selected SKU, the actual cost, and the overage. The client sees the running overage as selections finalize so the change-order conversation is not a surprise at drywall.

Allowance variance tracking

Running total of over-allowance selections.

The allowance-variance total updates as each selection locks. The client sees a running total of over-allowance (positive) and under-allowance (negative) selections across the entire scope. The reconciled total becomes the net change-order amount at substantial completion, so no surprise invoice.

Change-order log

Every scope change with client sign-off and date.

The change-order log captures every scope change beyond the signed contract: client-requested additions, discovered conditions (rot behind drywall, outdated wiring), designer-recommended upgrades. Each change order carries description, cost delta, schedule impact, and e-signature. The log becomes the audit trail if a dispute surfaces at close.

Client-approval surface

Approvals in a portal, not an email thread.

Client approvals (selections, change orders, pre-drywall walkthrough, substantial completion) live in a client portal with the approval record stamped by date, user, and IP. The e-signature audit trail satisfies most residential-construction dispute standards and gives the owner proof of consent if needed.

Selection vendor integration

Pricing pulled from supplier catalogs where supported.

Supported supplier catalogs (ProSource, Ferguson, Build.com, cabinet manufacturers via API) feed live pricing into the selection sheet so the allowance variance updates automatically. Unsupported vendors are entered manually with the invoice attached for audit. The pricing-source metadata travels with the selection.

Change-order threshold alerts

An alert when running change orders exceed ten percent.

The system fires an alert to the project manager and the owner when running change orders cross ten percent of contract value, which is typically where client-relationship stress starts. The alert prompts a project-health check-in with the client to reset expectations rather than a surprise at close.

Final reconciliation

One statement with net change-order amount at close.

The substantial-completion statement reconciles original contract, over-allowance selections, change orders, and credits into one final-invoice line. The client sees one number, not twelve. The reconciliation document also captures warranty start date, callback-request contact, and final-walkthrough sign-off.

Trade partners, scheduling, and field operations

The project-management surface a remodeler actually uses.

Remodeling CRMs usually ship a sales pipeline and stop. Strkr continues through construction because the sales relationship and the construction relationship are the same client relationship. Trade partners, schedules, PO logs, and field daily reports live in the same record as the signed contract and the referral source.

Trade-partner directory

Every sub with license, insurance, and W-9 on file.

The trade-partner directory tracks each sub by trade (electrical, plumbing, HVAC, framing, drywall, flooring, tile, paint, cabinets), with license number, workers-comp certificate, general liability certificate, W-9, and renewal dates. Expired insurance alerts prevent the firm from scheduling an uninsured sub into an active jobsite.

Project schedule with trade dependencies

A critical-path schedule by trade and task.

The project schedule tracks each task by trade with dependencies (demo before framing, rough plumbing before drywall, drywall before cabinets, cabinets before counters, counters before tile backsplash). Schedule slip on one task re-cascades downstream dates so the project manager sees the full impact.

PO and sub-invoice tracking

Running PO log with invoice-match status.

Every trade PO (framing crew, electrical rough-in, cabinet installation) lives in the PO log with the amount, scope, and expected billing date. Incoming sub invoices match against the PO. Over-PO invoices flag for the project manager's review before payment. The running total feeds the project margin.

Daily field reports

The site super logs the day from the phone.

The site superintendent logs the day from a mobile report: crews on site, hours worked, work completed, work blocked, photos, and tomorrow's plan. The report attaches to the job record and feeds the client portal's week-at-a-glance update. The client sees progress without the project manager drafting a weekly update email.

Lien-waiver tracking

Partial and final waivers tracked per sub per draw.

The lien-waiver log tracks partial waivers at each draw and final waivers at job close by sub. Missing waivers block the next draw. The clean waiver file closes out at substantial completion with the final-payment-ready status, which protects the firm from a mechanic's-lien surprise ninety days later.

Trade-partner performance scoring

Which subs are on-time, on-budget, and on-quality.

Each trade partner carries a running performance score across completed jobs: on-time percentage, on-budget percentage, callback rate, and client-rating. The quarterly review of trade-partner scores surfaces which subs to keep in heavy rotation and which to retire. The decision runs on data, not on favoritism.

Jobsite photo log

Automatic photo capture by date and job phase.

Site supers upload daily photos tagged by phase (demo, rough-in, drywall, finish, final). The photo log travels with the record and powers the marketing portfolio (with client consent). It also protects the firm in warranty disputes: proof of what the installation actually looked like at inspection and sign-off.

Client portal, referrals, and warranty operations

The post-contract surface the referral business runs on.

Remodeling firms earn referrals by making the client feel heard and informed from signed contract through the two-year warranty. The surface below keeps that experience consistent across every job, which protects the referral loyalty that drives the next ten years of growth.

Client portal

Approvals, documents, selections, and schedule in one place.

Each client gets a portal link with the signed contract, selection sheet, change-order log, project schedule, daily photo log, approval queue, and running schedule. The portal is read-only for documents and action-required for approvals. The client logs in once a week and knows where the job stands without a status call.

Weekly client update

The automatic email the project manager used to write by hand.

Every Friday the system drafts a client-update email from the daily field reports, the open approvals, and the upcoming week's schedule. The project manager reviews and sends in two minutes. The clients that got weekly updates refer at nearly twice the rate of clients who got silence between milestones.

Referral request on completion

The ask at the moment the client is happiest.

Thirty days after substantial completion the system fires a referral request with a direct-link review page (Google, Houzz, Angi, Yelp) and a referral-rewards explanation. The timing (final punch complete, final-walkthrough love still fresh) is where referral yield is highest. The outreach is standardized across every project manager.

Warranty callback tracking

Callbacks logged, scheduled, and resolved on the record.

Post-close callbacks (sticky door, grout touch-up, cabinet-door adjustment) log against the job record with status (requested, scheduled, resolved). The field crew sees the open callbacks by zip code to batch service runs. Resolved callbacks close out with a client sign-off photo so the warranty history is clean.

Referral-source scorecard

Which marketing dollar is actually producing jobs.

Every lead carries a required referral-source field. The scorecard rolls up by source (past client, Google, Houzz, Angi, Facebook, showroom walk-in, referral-partner-realtor) with cost (where applicable), leads, qualified consults, design agreements signed, construction contracts signed, and gross revenue. The owner sees the true ROI per channel over trailing twelve months.

Referral-partner relationship

The realtors, designers, and architects you refer to and from.

Referral partners (realtors, interior designers, architects, structural engineers) live in the directory with the referral-sent and referral-received counts. The quarterly review of two-way referral flow identifies the partners who are feeding the pipeline versus the one-way takers. The partnership strategy becomes data-informed.

Portfolio-ready project archive

Finished jobs with photos and copy, ready for the website.

At close, each project archives with the before-and-after photos, scope summary, client testimonial, and the project duration. The archive feeds the website portfolio and the Houzz profile with one data entry. The marketing team stops hunting for photos from the project manager six months later.

Head-to-head

Strkr vs the generic contractor CRM.

Most CRMs sold into remodeling were built as generic contractor tools or home-service platforms (JobNimbus, Buildertrend, CoConstruct, Houzz Pro). Strkr brings the design-build nuance that remodelers actually need without the service-business framing that doesn't fit a nine-month kitchen project.

Feature Strkr Generic contractor CRM
Design-agreement vs construction-contract split Two pipelines with conversion metrics One quote-to-invoice flow
Allowance and selection tracking Selection sheet with running variance Spreadsheet attached to the job
Change-order log with e-sign Native with running total Document attached to the record
Trade-partner directory with insurance Native with renewal alerts Contact list without insurance tracking
Project schedule with trade dependencies Critical-path with cascade Gantt chart with manual re-dating
Lien-waiver tracking Per sub per draw Document storage without status
Client portal with approvals Native with e-sign Email thread or basic portal
Weekly client update automation Drafted from field reports Project manager drafts by hand
Referral-source attribution Required field with ROI rollup Optional field without rollup
Warranty and callback tracking Native with photo sign-off Service-ticket workflow if available
How teams use Strkr

How remodeling firms run on Strkr.

The firms below picked Strkr for the design-build nuance and the referral-driven operating model. The playbooks are the patterns that moved revenue, margin, or referral yield measurably within the first two quarters.

Kitchen-and-bath firm, 42 jobs a year

Design-to-construction conversion lifted eighteen points.

A kitchen-and-bath firm ran design agreements at a 48 percent close rate from qualified consult but had never measured design-to-construction conversion. After tagging the two phases separately in Strkr, the firm learned the design-to-construction conversion was 61 percent, well below the 80 percent benchmark for similar firms. The gap traced to budget surprise at construction-contract presentation. The lead designer tightened the design-agreement scoping conversation with a budget-alignment template. Within two quarters design-to-construction conversion lifted to 79 percent, adding roughly $420K in annualized revenue on the same lead flow.

Design-build firm, 85 jobs a year

Change-order margin leakage closed by nine points.

A design-build firm with 85 jobs a year had been running change orders at 14 percent of contract value on average with margin on change orders only two to three points above cost. The firm migrated to Strkr's selection sheet with running variance and the ten-percent change-order alert. Project managers started catching over-allowance selections at selection sign-off instead of at drywall. Change-order volume stayed flat but change-order margin lifted from three points to twelve points because the firm stopped pricing change orders at near-cost to keep the client happy. Annualized margin improvement ran roughly $280K.

Whole-home renovation, 28 jobs a year

Trade-partner performance scoring retired two chronic subs.

A whole-home renovation firm had been running the same twelve trade partners for five years, including two subs with chronic schedule-slip problems that the owner tolerated out of relationship inertia. Strkr's trade-partner performance scoring surfaced the data: the two chronic subs were running on-time percentages of 42 and 51 percent against a shop average of 78 percent, and were driving an estimated $140K in schedule-slip cost through downstream trade re-sequencing. The owner retired both subs, replaced them, and shop-wide on-time percentage lifted to 86 percent within six months.

Historic-remodel specialist, 18 jobs a year

Referral yield doubled from the weekly-update automation.

A historic-remodel specialist running eighteen jobs a year earned 65 percent of revenue from past-client referral. The owner noticed referral rates had drifted down from 72 percent two years earlier and traced it to inconsistent client communication during the long (seven to twelve month) builds. Strkr's weekly-update automation from the daily field reports went live. Within one year, past-client referrals lifted from 65 percent to 78 percent of pipeline, and overall project count grew from eighteen to twenty-four on the same marketing spend.

Multi-location remodeler, 180 jobs a year

Owner-level margin visibility across three locations.

A three-location remodeler with 180 jobs a year had been running three different project-management stacks (one per location) because each location grew organically with different operations leaders. The owner had no single running-margin view across the business. Strkr consolidated the three operations onto one workspace with location-level filters. The owner now runs a Monday review of trailing-four-week margin by location, by project type, and by lead designer. Location-C margin was running four points below the shop average; the diagnosis and intervention cycle time went from quarterly to weekly.

A remodeling CRM that respects how design-build firms actually sell and build.

Start a 14-day Strkr trial with the remodeling template loaded. Design-agreement and construction-contract pipelines separated. Selection sheet with running variance. Change-order log with e-sign. Trade-partner directory with insurance tracking. Client portal with weekly updates. Referral-source attribution with ROI rollup. All on the flat per-seat line with Strkr AI included.

Common questions

What buyers in this bucket ask most.

How is a remodeling CRM different from a construction CRM?

A construction CRM is typically built for new-build residential or light commercial where the owner-to-contractor relationship is formal, the contract is a single document, and the schedule is driven by code-stage inspections. A remodeling CRM has to carry a longer consultative sales cycle (initial consult, in-home measure, paid design agreement, construction contract), a selections-and-allowances surface because residential remodels run heavy on client-selected finishes, a change-order log because scope evolution during an occupied-home remodel is the norm not the exception, and a referral-attribution surface because mature remodelers earn sixty to eighty percent of revenue from past-client word of mouth. Strkr ships the remodeling template out of the box; construction templates are available but they are different pipelines.

Can Strkr handle both the sales side and the construction side?

Yes. The sales pipeline (lead through signed construction contract) and the construction surface (schedule, trade POs, selections, change orders, client approvals, lien waivers, daily field reports) live in the same record. The handoff from sales consultant to project manager fires automatically at contract signing with the handoff checklist. The owner sees one record from first referral touch through final warranty callback, which is the data integrity most remodeling firms lose when they run a sales CRM and a construction tool as separate stacks.

What is the right allowance variance threshold to flag?

The practical threshold depends on firm size and project type, but most mature firms flag when running change orders cross ten percent of contract value and prompt a project-health check-in with the client. Below five percent, change orders are routine scope evolution and clients expect it. Between five and ten percent, running updates in the client portal keep the client aligned. Above ten percent is where client-relationship stress starts, and above fifteen percent is where margin and referral-loyalty both start to erode. Strkr's default threshold alert is ten percent, editable per firm. Some high-end custom-remodelers set it at six percent because their client expectation is tighter; some whole-home gut-renovation firms set it at fifteen percent because discovered-condition change orders are expected on older housing stock.

How does Strkr handle supplier catalog integration for selections?

Strkr integrates with major supplier catalogs via API or bulk-upload (Ferguson, ProSource, Build.com, cabinet manufacturers with public catalog APIs, tile and stone showroom catalogs where available). Supported suppliers feed live pricing and SKU-level specs into the selection sheet so the allowance variance updates automatically. Unsupported suppliers (local showrooms, custom fabricators) are entered manually with the invoice or quote attached for audit. The pricing-source metadata travels with the selection, so the project manager and the client can always trace a selected price back to the originating quote.

How many trade partners can Strkr track for one firm?

There is no practical limit. Mid-size remodeling firms typically maintain fifteen to forty active trade partners across the standard trades plus specialty subs (historic masonry, custom metalwork, structural engineering, acoustic consultants). Strkr tracks license number, workers-comp certificate, general liability certificate, W-9, and renewal dates per trade partner. Expired-insurance alerts prevent scheduling an uninsured sub into an active jobsite. The trade-partner performance scorecard (on-time percentage, on-budget percentage, callback rate, client-rating) runs across all active and retired subs for quarterly performance review.

Does Strkr support draw scheduling and lien waivers?

Yes. Draw schedules attach to the construction contract with milestone-triggered draws (contract signing, demo complete, rough-in complete, drywall complete, substantial completion, final). Each draw ties to a required lien-waiver status: partial waivers from each paid sub at each draw, final waivers from each sub at substantial completion. Missing waivers block the next draw automatically, which protects the firm from a mechanic's-lien surprise ninety days after close. The lien-waiver file closes out clean at final payment and archives with the project.

Try it free. Bring your team next week.

No sales call, no migration consultant, no four-month implementation. Enter your card, get 14 days of the full Pro tier, cancel any time before day 14 with zero charge. Spin up a workspace, import your CSV, and have something useful before lunch.